Balancing Under No Sequencing Control
Jan 1, 2022·
·
1 min read
Celso Gustavo Stall Sikora
Abstract
In this chapter, the assembly-line balancing is optimized for a production line under a random sequence of products. In contrast to Chapter 4, in which the models can be scheduled at wish, no control over the production sequence is assumed in the project presented in this chapter.
Type
Publication
Assembly-Line Balancing under Demand Uncertainty
For more information and the text, see [sikora-2022-book-alb-demand-uncertainty].

Authors
Celso Gustavo Stall Sikora
(he/him)
Postdoctoral researcher
Postdoctoral researcher in Operations Research at Friedrich-Schiller-Universität Jena.
Specialist in exact optimization methods, decomposition approaches, and AI-enhanced
combinatorial optimization, with applications in urban logistics, port operations,
and assembly systems.